HOME > BUSINESS > Coal India in talks to export to Bangladesh to beat slowdown

Coal India in talks to export to Bangladesh to beat slowdown

coalindiaCoal India Ltd. is in “deep consultation” with Bangladesh to export the dry fuel, Anil Swarup, Coal Secretary said.

Inaugurating the 2-days India Energy Forum (IEF) Coal Summit, Coal Secretary said the step has been taken in the backdrop of a sharp decline in demand for coal as well as with an inventory of over 80 million tonnes (MT) of the fuel at the pitheads and power plants.

“We are already into it and they (CIL) are in very deep consultations with Bangladesh for exporting it,” Secretary Coal added at IEF event.

Exports to Bangladesh would also aid CIL in increasing sales as India in July inked a landmark deal withBangladesh to construct a 1,320 mw coal fired power plant, the biggest project under bilateral cooperation.

On coal production target, Anil Swarup said the Ministry is working towards achieving the coal production target of one billion tonnes and will decide on reviewing this after 2-3 years. The government has not scrapped this target.

The government has set a production target of 598 MT for CIL for the ongoing financial year. The miner is eyeing to double its production to 1 billion tonnes by 2020.

When asked about subdued demand, he said the government does not make plans keeping in view the present situation.

Explaining further, he said: “We plan for the future. Our power plants are working at a plant load factor (PLF) of 62 per cent, but in the future we believe this PLF will go to 70 per cent and that is the time when we will have more demand.

“Also additional capacity will be added. So there is no logic in bringing down coal production. What will we do if there is demand in the future.”

Another point is that with UDAY, the financial position of the state discoms will improve and this will also have a positive impact on coal demand, Mr. Swarup added.

On the decline in offtake and volumes, he said as of March 31, there was an inventory of over 80 MT both at the pitheads and power plants.

“Where would they stock the coal. We had more than 80 MT. Now if your entire production in 500 odd MT and you have 80 MT of stocks, you will have to look at it and that is why CIL did not produce more. Second reason is that in August there were unusual rains, which impacted mining.

“I don’t think it is an issue as they (CIL) will catch up as there is exposed coal available and can meet the requirements,” he added.

Inaugural Session of the Summit was also addressed by Mr. Anil Razdan, President, India Energy Forum, Mr. A N Sahay, President MGMI, Mr. G C Mrig, President, ISMAA DC, Mr. U. Kumar, former CMD, SECL, Mr. N N Gautam, Convenor Organising Committee.

Follow ULTRA.news
NTPC starts 660 MW Solapur Super Thermal Power Project in Maharashtra One of NTPC's thermal plantsNTPC Ltd, India's largest power producer, has taken its total installed production capacity beyond the 51,000 MW mark with the addition of the 660 MW Solapur Super Thermal Power Project in Maharashtra.The total capacity of the NTPC Group has b...
BHEL commissions 800 MW supercritical coal unit in Karnataka The Raichur plantBharat Heavy Electricals Limited (BHEL) commissioned an 800 MW coal-based supercritical thermal unit at the  Yeramarus Thermal Power Station located in Raichur district of Karnataka, the heavy equipment maker said.The plant is a joint venture between BHE...
India is the first country to reuse nuclear waste on large scale – Minister A rally to popularize nuclear power in Mumbai in 2014The Department of Atomic Energy today said that India is the first country in the world where the waste produced by nuclear power plants is being used for civilian applications.Jitendra Singh, the minister of state ove...
NTPC achieves 12th Five Year plan targets, adds 12.84 GW in five years One of NTPC's several power plantsNational Thermal Power Corporation said it has achieved, and exceeded, its target for the addition of power generation capacity in the 12th five-year plan by adding 1,070 MW today.Three new units were added today -- one of 800 MW at Kudg...
India stockpiles crude oil worth Rs 4,258 cr as strategic reserve Undated government photo of construction work at one of the tanksIndia has filled a little over one-third of its phase 1 'strategic oil reserve' at a cost of Rs 4,258 cr, about $640 mln.The country is in the process of building five underground reserve facilities for cru...
After missing twice, India comfortably meets power sector targets for 12th five-year plan After missing its targets by wide margins in the previous two five-year plans, India is all set to comfortably meet or exceed all its power sector targets for the 12th five-year plan that ends this month.Five-year plans, borrowed from the Soviet Union, are a legacy of Nehruvi...
Power companies to save Rs 2,500 cr/yr as coal linkage rationalization expands The amount of money estimated to be saved by power companies in India due to the rearrangement of coal supplies has risen to Rs 2,503.50 cr per year, according to power ministry sources.The program of swapping coal sources, known as 'coal linkage rationalization', is in its t...
18,420 megawatt of thermal power projects face funding difficulties in India A large chunk of under-development coal-based power units have their construction stalled due to the paucity of funds, according to numbers obtained from the power ministry.In total, projects that have a design capacity of 18,420 megawatt, or 18.42 gigawatt, are classified as...
Delhi Pollution Control Board extends shutdown of NTPC Badarpur plant till January NTPC Ltd said the Delhi Pollution Control Committee has given directions to keep all its units in Badarpur Thermal Power Station closed till January 31, 2017.The reason for the committees direction has not been disclosed by NTPC. However, the reason is likely to be concerns a...
Adani Group commissions India’s largest tracker solar plant Infrastructure company Adani Enterprises Ltd said it commissioned India's largest tracker-based solar power plant at Bhatinda in Punjab.The 100 megawatt plant is also the largest solar project in Punjab.Tracker plants are those with motorized panels that keep tracking the...
India adds 1,732 MW of hydro-power capacity Prime Minister Narendra Modi inaugurated three hydro-electric projects in Himachal Pradesh, representing 1,732 MW of generating capacity, to the nation today.The biggest of the three is NTPC's Koldam, which has four generating units of 200 MW each. The second biggest was Par...
Reliance Infra sells 100% stake in transmission business to Adani Group Reliance Infrastructure Limited today said it agreed to sell all itstransmission assets to Adani Transmission Limited, the largest private power transmission company operating in India.This acquisition is expected to be completed in current financial year.The entire sale ...
ABB to install 600 KW solar energy in its Vadodara facility ABB, a power and automation technology company, today said it will install a 600 KW fully integrated and standardized microgrid solar energy at its Vadodara facility in Gujarat to help boost renewable energy generation while reducing dependency on fossil fuel.This microgrid w...
NHPC extends power purchase for 35 years Hydro power company NHPC Ltd said the power purchase agreements for its two power stations, Teesta-V power station and Rangit power station has been extended for another 35 years.Teesta-V has power generating capacity of 510 MW, while Rangit station has a capacity of 60 MW. ...
Heritage Foods commissions second wind power project with Suzlon in Andhra Heritage foods Ltd, one of the largest private sector dairy enterprises in Southern India, said it has finished the commissioning of the 2nd wind power plant at Vajrakarur of Ananthapur District in Andhra Pradesh.The wind power plant has a 2.1 MW capacity and is expected to g...
GAIL starts operations at polyethylene plant in Uttar Pradesh GAIL India Limited, a government natural gas transmission and marketing company, said it has started operation of its first UNIPOL polyethylene process line with a capacity to produce 4,00,000 tons of polyethylene per year in its Pata plant in Uttar Pradesh.GAIL's flexible hi...
Suzlon wins 52.4 MW project from Oil India, to power 28,000 households Suzlon Group, a renewable energy solutions provider, said it has won its first project from Oil India Ltd (OIL) for 52.5 MW for two sites in Madhya Pradesh and Gujarat.The project will provide power to around 28,000 households and will reduce .11 million tonnes of CO2 emissio...
Ducon, Chinese co to market NOx catalyst for power plants in India Ducon Infratechnologies, a technology company providing solutions in the digital and infrastructure space, signed an agreement with Zhejiang Hailiang Ecological Materials of China to market and distribute DeNOx catalyst -- used to reduce nitrogen oxide emissions from thermal ...
ABB India doubles solar inverter manufacturing capacity in Bengaluru ABB India, a power and automation technology company, inaugurated a new solar inverter manufacturing facility at Nelamanagala in Bengaluru, said the company.The facility is set to double the solar inverter manufacturing capacity of the company to 2GW in a span of five months,...
Jindal Steel gets 1.18 MTPA coal supply to Chhattisgarh power plant Jindal Steel and Power said that it has secured coal supply of 1.18 million tonnes per year (MTPA) for 5 years for its 540 + 134 MW captive power generation plants in Dongamahua and Raigarh in Chhattisgarh.The long‐term linkage will ensure steady and assured supply of coal fo...
Tata Power South African JV starts operations at 95 MW wind farm Tata Power's South African joint venture Cennergi started commercial operations at its 95 MW Wind farm project in South Africa's Tsitsikamma Community.The wind farm comprises of 31 V-112 3.075 MW Vestas, high-wind turbine with very high capacity factor.As the preferred bi...
BHEL wins Rs 3,500-cr order from NTPC Bharat Heavy Electricals Limited said it won an order worth around Rs 3,500 for the supply of two 800 MW boilers with supercritical parameters for Telangana Super Thermal Power Project (TnSTPP).The project is located within NTPC’s existing Ramagundam Power Station in Kari...
BHEL commissions 520 MW coal unit for Hinduja National Power Corp in Vizag Bharat Heavy Electricals Limited (BHEL) commissioned a 520 MW coal-based thermal generating unit at the 2x520 MW Vizag Thermal Power Project of Hinduja National Power Company Limited (HNPCL), Visakhapatnam.BHEL has already commissioned 5,010 MW of power plants in the utility ...
India’s natural gas supply to increase by 60% to about 150 MMSCMD till FY25 – ICRA The demand for natural gas in India will increase to ~330 MMSCMD by FY 25, while the supply will increase by 60% to around 150 MMSCMD by FY 25, credit rating agency ICRA said.The increase in supply will be due to the likely commencement of GSPC’s Deen Dayal block and ONGC’s K...
Coal India relinquishes most of Mozambique coal block Coal India Ltd said it has relinquished 170 sq. km out of 224 sq km allocated to it under two licenses for extracting coal in in Tete province of Mozambique.Coal India said the move was the result of study of geological data."In the 316th Board meeting held on July 04, 20...